SR1150
Distribution well
The product consists of a tank and a cover. The tank is equipped with 5 outlets for connecting pipes with a diameter of 110mm – one of them is intended for the installation of the sewage inlet pipe, while the remaining openings are used for connecting drainage pipes. In the event that a deeper drainage installation is necessary, there is the possibility of using an inspection chamber. It is produced as a monolithic structure made of polyethylene using a rotational molding method, which ensures impermeability to water and sewage, mechanical resistance to soil load, decompression, impacts, and resistance to aggressive substances in sewage, temperature changes, and full stability in the ground. The dimensions (below) of the tank allow for its installation on small plots. Additionally, installation is possible without the use of heavy and expensive cranes due to its low weight. The purpose of the distribution chamber is to evenly distribute sewage in the home sewage treatment system, and it also allows for periodic inspection.





SR1150
Specification
SR1150
Contact
Are you interested in the product?Contact
our sales representatives
SR1150
Similar products
Be eco
Download catalogs
Discover our new JFC Poland catalog in electronic format – always up-to-date, available 24/7 on your smartphone, tablet, or computer.
See more